So, we've got a crew of four installing the hardware for the solar system...brackets, racks, panels, inverter, and the connections.  They feel they'll get done today. At first they were a little nervous about the three story building, then they realized that the roof is only slightly pitched (15 deg) and consequently easy to work on.
brackets and racks for panels

So we're rocking!  As I wrote this, I got an email from the the company, O3 Home Solar, that we are ready to start the next step, connecting the system to the grid and dealing with the power company.  Moving along indeed.

UPDATE:  Tim and I discovered an issue.  We did not get the system that allows us to draw power during a blackout.  He was right that our contract didn't call for it.  So I called the office and spoke to Ronnie.  Between the two of them we figured out a solution and settled it very quickly and professionally.  It takes another service call, but we got it handled.  Yay.

[any further updates will be new posts]

No comments:

Post a Comment