Okay...since last I posted much has been accomplished.

Posts for the gate have been set.

A wedding has been hosted in the back patio area.



An A/C window unit has been wired and installed.


The enclosure for the living quarters access stairs has been framed, sheet-rocked, and a door hung.















The basement wall on the corner has been repointed and sealed. (Thanks Brandon and Malick)


And an access panel was cut in the upstairs ceiling and a cupola built to cover the roof access hatch.


Lots has been done.  Summer is a time when I can really get things done if i stay on task... and I have.

Monday, February 9, 2015

That's plumb purdy!

Rough plumbing is done!  Huzzah!  Thanks Greg Ellis of Ellisco Contracting.  Tub is "dropped in" its place, lavatory is nearby, and there is pex running everywhere.  I'll finish framing in the master bath shower and hardi-backer the walls therein.  Then I'll put a lid on the guest bath enclosure and hardibacker the bottom part of the wall.  The top part of the walls with be the green, mold resistant wallboard.  It will be painted later.

Pouring the concrete for the mailbox has been delayed and delayed...by weather, time, and physical condition of this writer.  Hopefully this week.  The forms are up (as they have been for nearly two weeks.)  We'll get there.

As this week goes on, I have to plan again the wiring pattern.  Things change.

Tuesday, January 20, 2015

I'll get by with a little help from my friends...

January 2015
Things are moving in the right direction.  My friend, Greg Ellis has been "helping" with the plumbing.  I write helping with, and mean doing.  We had made a boo-boo earlier when placing a toilet drain...too close to the side wall.  While working to correct this, he offered to finish the rough-in plumbing.  What a mensch!

I've decided that instead of finishing the corner of the front fence as planned, I'm going to build a brick pillar for the mailbox instead.  I've readied the forms for the concrete pad, but ran out of daylight before I could do the pour.  I'll try to get it before the rain on Thursday.

I've agreed with the owners of the property behind to split the cost of the fence between us.  I'll buy the materials later and submit a bill.  We'll work on it together.  I've got to get the fences done.  I've had too many things stolen from the yard to leave it open any longer.  It was bad enough before, but no that they have taken the chain-link fence between us down, even more people pass straight through.  That's going to stop.

I've found a floor guy who will do the floors at a reasonable price.  I need to do that before putting in the cabinets.  Need to start the electrical soon (it keeps getting put off for other things).  I also need to get the plumber to run the gas lines.  They are needed for the fireplaces (downstairs and upstairs), the hot water heater, and both HVAC systems.

At an auction a week ago, I bought an English pub sign.  The Brookes Arms closed and was being demolished.  The sign made it to Palestine.  We'll put Nickel Manor on it with possibly our coat of arms or some other graphic.  It should look great out front.

Lots to do, little money to do it with, and not a lotta time to spread around.  Ah well, the life of a landowner.