{Pun intended}
While looking at the floor for the other restroom in preparation of the plumbing, I found that the floor had to go; it was unsafe. So where there was once going to be a restroom is now a hole from dirt to roof. Bummer. I will, this coming week, rebuild the floor and run the pipes for the restroom/ dressing room. Oh that's right, I forgot to mention the change. The format of the restrooms have changed. There will be two restrooms as before, but both will be unisex. However, the west westwoom (sorry 'bout that) will be constructed so as to double as a dressing room for Kathy's yoga students. Because of that extra size, it will also serve as the "handicapped accessible" restroom required by code. This solves many problems.
Speaking of changes: Although Kathy and I had agreed on NO MORE CHANGES to the kitchen design...she changed it anyway. We are now going with granite tiles for the counter tops. I'm about to run away from home.
Since school starts soon and the show, Annie, which I have been involved in is over tomorrow, next week means hitting the project hard...except for the time I have to be making a new schedule for my classes and taking a less-than-ideal workshop. Busy, busy boy. I probably want to work mostly at night anyway because of the heat.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment