Success! We now have two toilets in what will be the "Ladies Room". The permanent lavatory should go in tomorrow with the dividers shortly thereafter. This is a major milestone on the way to habitable. The vinyl tile floors were hell on my knees and back (even with knee pads), but it was worth it. Once the sink/lavatory is in, I can start bringing the water and drains upstairs and over to the "Gents Room". If I had to, I could stay there now. I wouldn't like to, really, but I could if I had to.
Somebody tried to break in last Sunday, but were foiled not by the alarm system, but by a well constructed door and the steel bar cages on the basement windows. Take that!
Here is a sequence of pictures of the restroom construction:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment