Today I finally made some real headway on the floor of what will become the handicapped accessible restroom. I was having trouble largely due to the fact that, as with much of this building, nothing is regularly spaced. The slots for the floor joists vary as much as 4 inches from one to the other. Even their lengths vary as much as 2 inches. But, regardless, I have one-third of the decking down now. When the decking is done, I'll lay the hardi-backer down, then the flooring.
On an even more positive note, the inspector passed the new breaker box and meter assembly. By the end of business Wednesday we should have the meter moved from the old, rather dangerous box, to the new, and a new power drop from the pole connected. Then the wiring can start. We will start with the upstairs- the living quarters. Once that is done, we'll do the main floor. Of course is has to be commercial code, whereas the upstairs is residential code. Once all that is done, the basement will get the electrical make-over (also commercial code since it is connected to the floor above).
One sad thing to report: Some #@%&$# bag shot our male hawk. We have, sorry, had a pair hunting the area of the creek that runs along the property. I found the male in the yard Saturday... dead with a gunshot to the body. There can be no reason and no excuse. And since red tailed hawks mate for life, the female is now a widow. No more baby hawks. I'll call the game warden Monday.
Sunday, November 3, 2013
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment