Sounds like a good plan, but it really puts the onus on me to get a move on. It also means I'm going to have to hire some help for the summer- a strong back to lift and tote the things I can't anymore. So new project list to be completed by summer's end:
- finish putting up fencing for security
- install new electrical panel and 2 sub-panels
- sand upstairs floors
- run water and drains to upstairs bathrooms, kitchen, and laundry area
- repair all windows including basement
Then by Year's End:
- move major table tools to upstairs or basement from street level
- begin wiring upstairs enough for kitchen, laundry, and bedrooms
- install wall in between bathrooms upstairs
- cut door from master bedroom to Master Bath
- refinish floors in bedrooms and kitchen
- plaster upstairs walls that need it
Ask me again in August 2014 how things are going.
Hope I can make time to help again this summer. I'll try not to cut any holes through the floor in the wrong place this time.
ReplyDelete