Lots of work done since last time. Got the concrete floor in the belltower poured. Not the best concrete I've ever done, but it was a confined space. Oh well. Put up new walls on the concrete as a base for the floor we put in level with the "main hall". Then Jim and I pulled out the decaying doorway to the front and replaced it with a treated lumber and Hardipanel wall. This will be home to my new electrical meter and breaker box.

Other end- Kathy pulled the tiles in the NW corner basement room, getting it ready for a cement floor. I tore out the floor/ceiling of the NE basement. I've now replaced the joists and taken out the corroded plumbing. The tiles still have to come out of there, then we'll be ready to concrete the floors of the back three rooms. Progress!