Thursday, October 16, 2014

I was Framed!

Not a long post tonight.  Having trouble sleeping, but just as I began typing, I started getting drowsy.

Life has been a speed bump in the road to complete the Nickel Manor.  Health, work, family, financial reality all have had their feet on the brakes.  But we're moving again.

The now hoisted and nailed bathroom wall.


I have finished framing in the kitchen, and I have nearly finished the the two upstairs bathrooms' framing.  I am to have some help on the plumbing (which I never finished), and then I shall tackle the wiring.  Sometime before the end of time (or December 31) I will hopefully get moving on the kitchen cabinets with Mike R's help.  There will be an ending, Bonarotti! (movie quote, so sue me)

Wednesday, March 19, 2014

Getting the lead out.

Okay, so the title of this one is a little tricky.  Think lead, pronounced  /led/, the metal.  Then go to its Latin name plumbum from which we get the elemental symbol Pb for it.  Finally morph that into the modern word for the pipes that carry water and waste around our homes and you have it: Plumbing!

So I've been working on the plumbing of the Manor, trying to get it roughly to where it needs to be before finishing.  As I got to the point of putting in the drainpipe for upstairs, I found something surprising and problematic.  In the space between ceiling and floor, running next to the joists, I found the original ceramic drainpipe still in place.  This is, however, when we bought the place, that was not being used as an upstairs drain.  It was sealed off and "alternative plumbing solutions" were employed.  (For that read rubber hoses run behind the walls.)  The problem this creates is that I must now remove this ceramic pipe to make room for the new drains.  That means cutting away a large section of the ceiling to get to it.  My back can't handle that these days.  And that means I have to hire someone, which in turn means less moolah for other things.

Bummer!

On the good side, Kathy and I got the big pile of rubble cleaned up and hauled off.  It was all the broken brick pieces, concrete shards, chunks of plaster, and just plain rocks that had been piled up in the back yard of the Manor for nearly a year.  Of course it kept growing during that year.  The area looks sooo much better.  Step by step-- inch by inch-- task by task--- we approach our goal.

Thursday, February 6, 2014

Baby it's cold out there.

Okay, so I've been pretty lax about working down at the Manor for a bit.  It gets really cold in there!  Freezy fingers get smashed and slashed and gashed pretty easily.  Boy's gotta be careful.

Once I got my propane heater back from the "Grinch's Lair" (Jeremy Janz, Sonia Martinez, and Ian Warmke), I am able to work pretty well.  I've done some down there, but it's hard to find the time.  So much to do- so little time.  There are three upstairs windows I need to rebuild, one ground level window to finish rebuilding, and most of the basement windows to redo.  After that, rehang the garage/basement "barn door" and work on sealing it.  Those are the next things on the agenda.

After that, plumbing to the upstairs.  It shouldn't be too hard to rough it in since we will have a  "wet wall".  (Am I over-using quotation marks today?)  I want to get this done before spring break in March.  I am NOT on track for a July move-in so I must get myself in gear.

Wednesday, January 15, 2014

...in sickness, and in health...

You must have noticed- no blog entries here for a while.  That's because I was sick for nearly a month.  It was one thing leading to the next.  As a result, I have done almost nothing on the building.  It's a pain, believe me.  Better things coming.  Be sure of that.

Sunday, December 1, 2013

It's Just a Frame of Mind

This has been a busy busy week.  Along with all the other things listed earlier, I have framed in the walls around the cellar stair opening and reinforced the basement doors for security.  It is now several times stronger (burglars will not be able to just kick through it like before).  I have also rebuilt the window and frame in the bell-tower.  I've got it boarded up right now, but I'll get glass in it soon.  I have also been continuing to clean and re-organize the place.  Progress is being made.  Now back to school for a while.




Tuesday, November 26, 2013

Entropy Schmentropy

I have made great strides this week.  Some of those strides have been backwards and sideways, but still...great strides.  I have done a lot of cleaning and organizing.  Much needed, I must say.  Among the many things I have tackled is the glass (or lack of) in the windows.  Many windows have glass that is broken or cracked.  While working to prep one of them, I took off the thin plywood that covered the hole where the glass should be.  When I did, the whole window fell to pieces.  Even the base plate under the window was rotted.  I now have to rebuild this window.  I suspect that there are others in a similar condition (two of which I already know).  This will slow down the overall process of sealing the building against the cold wind.  Damn.

Speaking of cold, I am doing something I shouldn't.  I bought a kerosene heater... the "jet" type.  Makes a lot of noise, but puts out a lot of heat.  Thing is, it's supposed to only be used in "a well ventilated place" like outside.  I'm using it in the great hall.  Have to remember to ventilate now an again.  But boy does it keep the work space warm and dry.

I did finish hanging the door I wrote of, and put in the mortised door latch and lock.  Looks good.  Tomorrow I must finish re-building the windows and try to cut the glass to re-glaze them, otherwise I'll have to hire the work done.  I can't afford that.  More pictures coming tomorrow.

Sunday, November 17, 2013

Major Progress...Sergeant Success

Okay...since last we met...
We got the meter moved over and the "pigtail" drop from the power pole connected.  Woohoo!  Shortly after that, Jim V and I got the power connected over from the new breaker box to the old so that we still had power to work with.  Of course we didn't just patch it over; we made important improvements to the system to make it safer as well.  Oldest fuse box-- gone.  Old meters--history.  Questionable connections-- reconnected.  I also started pre-wiring the basement.

This weekend, I have been busting my tail to get other things done.  Finished decking the floor in the "new" bathroom.  Put electricity into it, too.  Hung a solid door that needed lots of work.  Got a lot of cleaning done, and made a lot of progress on straightening up the main floor.  I'm trying to get it ready for Kathy to teach yoga there soon.  Kathy got into the act as well.  She took the shop-vac upstairs and started getting that in shape, too.

Everything is moving forward.  One weird and troubling thing... the walls were sweating so bad there were puddles on the floor.  This humidity coupled with the thermal mass of the thick brick walls makes for a lot of condensation.  Going to have to deal with that, too.

Next week, Thanksgiving week, will be a holiday for me all week.  Going to bust a gut to get lots done, while learning my lines for "Nevermore" (see http://notonys.blogspot.com). Going to be a busy life for a while.